-Sign contract

Acquire engineering and permits

HO turn engineering plans into H.O.A.

along with their paperwork

COLLECT $1,000 (amount allowed to be

collected per contractor’s board)

Picture

-Lay out and dig.

Picture

~Inspection~

(Depending on Jurisdiction)

COLLECT amount agreed upon in contract

-Plumbing; solar stub, gas lines-

verify with HO

Picture

-Steel.

Picture

-Electrical; other outlets(BBQ/Fireplace)

verify with HO.

Picture

COLLECT amount agreed upon in contract

~Inspection~

(Depending on Jurisdiction)

-Gunite

Picture

-Color/Type of deck-

verify type/color with HO

COLLECT amount agreed upon in contract

-Tile; install water features.

Picture

-Deck

Picture

COLLECT amount agreed upon in contract

-Final Electrical; panel,lights,GVA’s.

Picture

-Rebuild walls and hang gates.

Picture

-Install alarms and In-floors. Let HO know they

must call gas company.

Picture

COLLECT amount agreed upon in contract

~Inspection~

(Depending on Jurisdiction)

-Plaster-verify type/color with HO: Notify HO

not to turn water off till full.

Picture

-Start-up and brush.

Picture

~Inspection~

(Depending on Jurisdiction)

-HO must call (Business is not allowed) gas

company to change meter.

-Add Salt and HO tutorial.

Picture

COLLECT FINAL amount agreed upon in contract